Built-In Central Cleaning SystemMODEL: CV350, CV353, CV450, CV553SYSTEM PLANNING AND LAYOUT . . . . . . . . . . . . . . . . . . . . . .2Examples .
10INSTALLATION IN EXISTING CONSTRUCTION (continued)MOUNTINGPLATEMOUNTINGHOLE (2)ELBOWFIGURE 36MOUNTINGPLATEINLETFIGURE 371. Make cutout according to d
11FLOOR INLET INSTALLATIONFLOORSUB-FLOOR29/16"31/16"INLETEXTENSIONFLOORINLETFRAMEMOUNTINGBRACKETSEALFLANGEDFITTINGFIGURE 40CUT TOLENGTHEXTEN
NuTone Power Units covered by two-year warranty.All other Central Cleaning products are warranted for one year from date of purchase.Product specifica
2SYSTEM PLANNING AND LAYOUTThe NuTone Central Cleaning System consists of a Power Unit,PVC Tubing and Fittings, Wall Inlets, a flexible Hose and vario
3• Locate the power unit away from the general living area in anaccessible location for changing the soil bag and periodicallycleaning the secondary f
4INSTALLATION IN NEW CONSTRUCTIONOnce the locations for wall inlets have been determined, mountall inlet brackets.1. Choose the appropriate mounting b
5INSTALLATION IN NEW CONSTRUCTION (continued)Use the following installation guidelines when installing tubing.1. Start tubing installation at farthest
6INSTALLATION IN NEW CONSTRUCTION (continued)FIGURE 19FIGURE 21MODEL 365DOUBLE FLANGEDTEEWALLINLETMOUNTINGBRACKETSHORTENWALLFIGURE 17MODEL 360 WALL IN
7INSTALLATION IN NEW CONSTRUCTION (continued)1. See Figure 23. Fasten the mounting plate to a stud withinthree studs (48") of an electrical outle
81. Using rubber couplings and hose clamps to connect intake andexhaust tubing.2. Connect intake tubing to intake tube on power unit.3. Connect muffle
9Use the following procedures for installation in existing construction.Starting from farthest wall inlet location, install each inlet as describedbel
Partendo da D
Modelli | Tipo di Documento |
---|---|
DVL 041 |
Comments to this Manuals